The Company has carried out electrical projects at Israeli train stations; amongst them:

  • Petah Tikva, Segula Intersection
  • Rishon Letzion, Rishonim
  • Ashkelon
  • Sderot
  • Netivot
  • Netanya, Sapir
  • Ra’anana South
  • Tel Aviv, Savidor
  • Karkur Tunnel
  • The railroad bridges on the Beersheba-Ashkelon line

The following are details of the electrical work carried out at the train stations:

  • General electrical works: installing cable ducts, metal trays and ladders, cable pulling, terminations and connections, system integration, tests, commissioning and activation of all systems
  • Manufacturing and installing electrical switchboards
  • Installing generator-sets
  • Installing a DC system and battery rooms
  • Outdoor and interior lighting systems
  • Grounding and lightning protection
  • Designing and implementing monitoring and control systems
  • Aux systems – fire detection and firefighting systems, security systems, PA, CCTV, IT, access control, etc.

The work was carried out during: 2008-2016

Back to Selected Projects