El-Mor carried out the work on the electricity, lighting and very low voltage systems, using the most advanced technologies and standards, in the following projects:

  • Beersheba Stadium
  • Petah Tikva Stadium
  • Tel Aviv Arena
  • Holon ‘Toto’ Center

We implemented the following systems in these projects:

  • Advanced lighting systems in accordance with strict FIFA and FIBA standards
  • Peripheral lighting system MV work: transformers, switchgears, bus-bars
  • Low voltage work
  • Manufacturing and installing electrical switchboards of up to 4,000 amps
  • Installing metal trays, ladders and conduits
  • Laying, terminating and connecting MV & LV cables
  • Installing generator-sets with automatic switching capabilities
  • Grounding and lightning protection
  • Very low voltage systems – monitoring, access control, PA and firefighting system
  • The work was carried out during: 20013-2015
Back to Selected Projects